How do I fill out the renovation application form for new public rental or subsidized housing?
A comprehensive guide to contractors, project details, and pre-commencement documentation.

Avoid move-in delays caused by application rejection!

A breakdown of the key tips and liability clauses for filling out Sections A and B of the "Application for Renovation Works by Renovation Contractors."

▲ T.L Home reference image

Design with warmth; an attitude toward living.

Guide to the Renovation Application Form for New Public Rental and Subsidized Sale Flats 1.png

30-Second Key Highlights Summary

The official application form of the Housing Authority explicitly stipulates that tenants may only carry out works that have received final approval from the Housing Manager; no work may commence without such approval.

Project specifications must be clear and specific—for example, by stating "floor tiling throughout the entire unit" or "custom-made wooden cabinets in the living room that do not extend to the floor"—and should avoid vague wording that could invite scrutiny during the approval process.

Should any damage be caused to the original fixtures, equipment, sewage conduits, or drains, the tenant shall be liable for compensation in accordance with the lease agreement; the original condition must be documented prior to the commencement of work.

Core Decisions and Pitfall-Avoidance Checklist

Application Form Fields

Standard Completion Example

Incorrect way of filling out the form

Key points to note during the approval process

Project Location

Living and dining room, bedrooms, kitchen, bathroom

Entire house, various locations (too vague)

Clearly list items for each functional area individually.

Project Description

Installation of SPC flooring; wall preparation (skimming and plastering) and application of emulsion paint; installation of aluminum ceiling panels.

Luxury whole-house renovation and major interior overhaul.

Specify the detailed construction methods and material names.

Commitment Regarding Fixed Facilities

Retain existing protective facilities and ensure proper protection for existing piping.

Rerouting the drainage channel

(Likely to be rejected)

Any alterations to drainage or soil pipes must comply with specifications.

Contractor Details

Fill in the registered company name, Business Registration Certificate number, and contact number of the person in charge.

Handwritten text is blurry; no seal impression.

Verify that the contractor holds valid employees' compensation insurance and third-party liability insurance.

Step-by-step guide: Standard Operating Procedure

01

Download two copies of the official application form.

Download the latest version of the application form from the Housing Authority website or obtain a form in person at an estate office.

Tip: The original copy is to be filed by the Housing Department, while the duplicate should be kept safely by the head of the household.

02

Collaborate with the design team to prepare the schedule of works.

A professional design team provides a clearly itemized list of project specifications, organized logically to facilitate review and approval by the manager.

Tip: A professional and standardized list helps expedite the approval process.

03

Signature of the property owner for confirmation, with the contractor's documents attached.

Please attach copies of the renovation company's business registration certificate and insurance documents, as well as a sketch of the design concept (if applicable).

Tip: Having all required documents ready can prevent estate staff from asking you to submit additional paperwork.

04

Construction may be scheduled only after obtaining the approved copy.

Once the Housing Affairs Manager has signed the approval for the specific numbered project in Part B, arrangements will be formally made for the tradesmen to commence work on-site.

Tip: Construction must strictly adhere to the approved project plan; do not make unauthorized additions or reductions.

T.L Home: A Perspective on Spatial Magic

How do designers simplify the complex?

Clear plans facilitate communication.

A color-coded floor plan is attached, clearly demonstrating that all furniture is either modular or does not interfere with the structural elements, thereby addressing any concerns the village office might have.

End-to-end document archiving

Upon completion, the approved form and the final statement of project income and expenditure will be filed in the tenant handbook, providing greater assurance for future lease termination or relocation.

FAQs for this quick guide

Q: How long does it usually take for approval after submitting the application form?

A: Generally, the estate office completes the review within 3 to 7 working days of receiving all required documents and notifies the tenant to collect the approval letter. It is recommended to submit the application immediately after taking possession of the unit to ensure work can begin as soon as possible.

Q: What happens if a specific item in the application is rejected?

A: The Estate Manager will indicate the approved project number in Part B. Projects that have not been approved may not be implemented; however, after consulting staff to understand the reasons for rejection, the design team may revise the proposal and resubmit it for approval.

Q: Do you need to fill in the form if you want to DIY your own painting?

A: If tenants carry out minor works themselves, the Housing Authority has a separate "Application Form for Self-arranged Renovation"; this also requires declaration and registration with the estate office before work begins.

The above information is for reference only; the Company assumes no legal liability whatsoever.

Would you like to know more about your organization's design proposal?

Send your floor plan to the T.L Home design team, and we will provide a preliminary spatial feasibility analysis and a transparent quotation.

Fully Transparent Itemized Quotation

One-Year Structural and Construction Maintenance

Related Quick Guides

  • What comes first when renovating an old public housing flat? The correct order for plumbing, electrical wiring, waterproofing, flooring, and furniture.

  • Water leaks, mold, and tripped circuit breakers in public housing: Should you report the repair and mitigate damage first, or proceed with renovations?

  • Distinguishing Between Routine Maintenance and Self-Funded Renovations in Public Housing: 10 Questions Tenants Must Ask Before Renovating

  • Whatsapp

Consultation: 6503-8879

Customer hotline: 3709-6325

Opening Hours: Monday - Saturday, 9:00 AM - 6:00 PM 

Address: Unit T, 10/F, Block 3, Camel Paint Building, 62 Hoi Yuen Road, Kwun Tong

T.L home interior design limited all rights reserved©2026

bottom of page